From AED 800,000
Property ID: SZP-0002
Where Urban Culture & Nature’s Silhouette Find Unique Balance
Introducing Ellington’s first residential development in Arjan, the project sits in a unique location close to Dubai Miracle Garden and Dubai Butterfly Garden. Arbor View is located in a quiet family-oriented area with easy access to the community’s amenities and throughways.
Studios, 1,2, and 3-bedroom apartments
Building Configuration:
- 7 Residential Floors
- Basement
- Ground Floor
- 6 Passenger Elevators
- 2 Service Elevators
- Studios, 1 and 2-bedroom: 1 car parking space
- 3-bedroom: 2 car parking spaces
Unit & Sizes:
- Studio – 21 Units – From 451 sq. ft to 574 sq. ft
- 1 bedroom – 69 Units – From 893 sq. ft to 1,028 sq. ft
- 2-bedroom – 41 units – From 1,204 sq. ft to 1,340 sq. ft
- 2-bedroom & study room – 27 Units – From 1,359 sq. ft to 1,444 sq. ft
- 3-bedroom – 13 Units – From 1,670 sq. ft to 1,761 sq. ft
Location:
A strategic connectivity that ensures seamless access to the wider city and its vibrant offerings, encircled by Dubai’s main roads: Al Khail Road, Mohammed Bin Zayed Road, Hessa Street, and Umm Suqeim Road.
A prime location that merges convenience with exclusivity with a number of retails, supermarkets, hospitals, parks, and schools nearby.
L O B B Y:
2 double-volume entrance lobbies with lounge, workstations, and feature art pieces and trees.
P O O L D E C K:
Gated pool deck with a separate adult and kids‘ pool an multi-sensory water features
C L U B H O U S E:
For party and holiday events with a lounge, food preparation station, and a dining area that is convertible into a billiard table.
Y O G A S T U D I O:
Indoor yoga studio with aero hammock
L I V I N G & D I N I N G A R E A:
Introducing cloak entry spaces and workstations
Payment Plan:
Booking | 20% |
30 days after the reservation date | 10% |
90 days after the reservation date | 10% |
150 days after the reservation date | 5% |
240 days after the reservation date | 5% |
On completion of 30% construction of the project | 5% |
On completion of 40% construction of the project | 5% |
On completion of 50% construction of the project | 5% |
On completion of 60% construction of the project | 5% |
On completion | 30% |